Location: Putney Embankment SW15
The Oxford and Cambridge University Boat Race takes place on Saturday 11th April 2015. Local traffic management measures will be in place from 09:00 hours to 19:00 hours.

A306 Roehampton Lane, Roehampton

07 April — 08 April

Delays likely Lane closure

Works location: A306

Works description: Safety Camera Renewal Scheme - Carriageway Works - Replacement Of Existing Safety Camera Pole In F/W Plus Slot Cut And Install New Sensors In Carriageway

Responsibility for works: Transport For London

Current status: Planned work about to start

A3003 The Terrace, Barnes

07 April — 09 April

Delays likely Traffic control (multi-way signals)

Works location: A3003

Works description: Locate And Excavate 1 Subsequent Blockage In Existing Duct,Locate And Excavate 4 Blockage In Existing Duct

Responsibility for works: BT

Current status: Planned work about to start

A3003 The Terrace, Barnes

07 April — 10 April

Delays likely Traffic control (two-way signals)

Works location: A3003

Works description: New Water Connection 1x32mm Mdpe Mtrd Supply Off 250mm Hppe Main. 2m Footway And 6m In Carriageway. Our Intention Is To Completethepermanent Reinstatement In The Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

A205 Upper Richmond Road, Putney

07 April — 22 April

Delays likely Lane closure

Works location: A205

Works description: Connections Projects:New Supply Scheme: (Approx Depth 450mm-600mm):High Voltage And Low Voltage Jointing To Provide New Electrical Supplies To The London Square Development.

Responsibility for works: UK Power Networks

Current status: Advanced planning

A205 Upper Richmond Road, Putney

08 April — 16 April

Delays likely Lane closure

Works location: A205

Works description: Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 995419 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours.

Responsibility for works: UK Power Networks

Current status: Planned work about to start

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

April 7, 2015