Road Closures Ahead in Putney and Roehampton

Diversions and delays in the local area due to road works

Participate

Traffic and Travel Problems in Putney

Sign up for our weekly Putney newsletter

Comment on this story on the

putney road closures

Bramcote Road, Putney

17 December — 20 December

Delays possible Traffic control (two-way signals)

Works location: Unknown

Works description: New water connecton 1x32mm MDPE MTRD supply off of 4" CI main excavating3m footway and 3m in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU309000807687740045-001

A3 Kingston Road, Roehampton

19 December — 19 December

Delays likely Lane closure

Works location: Unknown

Works description: 10/522 TEL0207063 - RECUT OF MAGNETOMETER SD1 (522), 22:00 - 23:59, SW/B LANE 1 & 2 CLOSURE, MOVING ALL TRAFFIC INTO LANE 3.

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004356



Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.

December 19, 2018

Bookmark and Share