Diversions and delays in the local area due to road works
A219 Putney Hill, Putney |
24 June — 25 June |
Delays likely Lane closure |
Works location: A219 |
Works description: Install 2m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building |
Responsibility for works: BT |
Current status: Planned work about to start |
A306 Castelnau, Barnes |
12 June — 23 June |
Delays likely Traffic control (two-way signals) |
Works location: A306 |
Works description: Critical Sewer Failure--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start
A219 Putney Hill, Putney |
22 June — 26 June |
Delays likely Lane closure |
Works location: A219 |
Works description: Chamber Repair Lrg Frame& Cover Within Carriageway Only (5 Day )Toa Llow For Concrete Curring. Working In Collabporation With Centrecommsin Carriageway. Our Intention Is To Complete The Permanent Reinstatementin The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start
|
|
|
Charlwood Road, Putney |
12 June — 29 September |
Delays likely Road closure |
Responsibility for works: SGN |
Current status: Advanced planning |
|
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.