Road Works Ahead in Putney and Roehampton

Traffic disruption and diversions may occur

Participate

Traffic and Travel Problems in Putney

Sign up for our free weekly newsletter

Comment on this story on the


Gas mains replacement works are on-going in the following roads:

Portinscale Road SW15 From 21/07/2014 to 31/08/2014

Buttermere Drive SW15
From 17/06/2014 to 25/07/2014

Putney Bridge SW15 is closed to vehicular traffic for major repair works commencing 14th July 2014 for 3 months. One footway will remain open for pedestrians to cross the bridge; while cyclists will have to dismount. There are Advanced Warning Signs at strategic locations on both sides of the river to warn motorists. For additional information about the closure please visit www.wandsworth.gov.uk/putneybridge or Email putneybridgerepairs@wandsworth.gov.uk

Street Parties

Blackett Street SW15 will be closed for a Street Party closed from outside number 2 to outside number 26 on 26th July 2014. Local diversions apply.


Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

 


July 18, 2014